01 · Transformer rewinding
A lightning-struck 100 kVA, back on the pole
An oil-cooled distribution transformer took a strike in a spring storm. We stripped, rewound and tested it rather than scrapping the tank.
Budgam · 100 kVA
Price Guide 2027–28 now live · Prices incl. GST
BrowseCase studies
What came in, what we found, what we did about it. The problem first, the price before the work.
Sample content — replace before launch
01 · Transformer rewinding
An oil-cooled distribution transformer took a strike in a spring storm. We stripped, rewound and tested it rather than scrapping the tank.
Budgam · 100 kVA
02 · Motor rewinding
A three-phase chakki motor burnt out at the busiest time of year. Rewound, re-bearinged and balanced inside a week.
Anantnag · 15 HP
03 · Transformer manufacturing
An apple cold store kept tripping an undersized supply. We sized, built and delivered a three-phase unit from the price guide.
Shopian · 50 kVA
04 · Transformer repair
A guesthouse transformer failed in deep winter. Repaired at the Leh outlet without waiting for the highway to reopen.
Leh · 25 kVA
02Where they came from
Every job on this page went back to the factory in Srinagar. The copper lines run from there to where each one came from.
Sample content — replace before launch
A kVA or HP figure and what the job is — that is enough to start.