Skip to main content

Price Guide 2027–28 now live · Prices incl. GST

Browse
Paramount Electricals

Service

Transformer manufacturing

Transformers built to order at our own factory in Srinagar, single phase and three phase.

01What we see most

Sound familiar?

Supply runs below nominal
Our 110-input and 90-input designs are built for a supply that sags rather than one that holds steady.
A replacement is no longer made
If the original unit is obsolete, we can build to the rating you need rather than the one a catalogue offers.
Off-list rating
The guide lists common ratings. Manufacturing to order means the list is a starting point, not a limit.

02About the work

What to expect.

We manufacture transformers at our own factory at Sathu Payeen, Barbar Shah in Srinagar. Building in-house means the specification is ours to set: the rating, the cooling, the winding material and the input voltage the unit is designed around.

Our current price guide covers single phase from 5 kVA to 25 kVA and three phase from 7.5 kVA to 400 kVA, in dry type, oil-cooled and toroidal builds. If what you need sits outside that list, tell us the load and we will quote it.

We do not promise a turnaround time before seeing the unit. Ask us when you bring it in and we will tell you honestly.

03Process

How it works.

  1. Tell us the load

    The rating in kVA, the phase, and where the unit will run.

  2. We quote

    Against the price guide where the rating is listed, or specifically where it is not.

  3. We build

    Core, windings and assembly at the Srinagar factory.

  4. Testing and hand-over

    Collect from the outlet nearest you.

A worker in safety glasses measuring a steel frame on a workbench
Sparks flying from an angle grinder as a worker cuts metal in a workshop

—Case study

“They explained exactly why the old transformer kept tripping before quoting for a new one. The price matched the guide, and the unit arrived when they said it would.”

Cold-store operator · Shopian · 50 kVA three phase
All our work

Sample content — replace before launch

From the bench · Transformer manufacturing

An apple cold store kept tripping an undersized supply. We sized, built and delivered a three-phase unit from the price guide.

Rating
50 kVA
Phase
Three phase
Price
As per guide
Read the job

Sample content — replace before launch

Winter voltage up here is a lottery. The transformer they built for our kitchen and laundry load has not missed a beat through two seasons of snow.

Hotel general managerGulmarg · dry type transformer

04From the catalogue

Or buy new.

  • Single Phase · Dry type

    Dry Type Single Phase 110-Input Transformer

    5–10 kVA · 3 ratings · 110 V input

    from

    ₹20,000

    2027–28 price

  • Single Phase · Oil-cooled

    Oil Type Single Phase 110-Input DL Transformer

    5–25 kVA · 7 ratings · 110 V input

    from

    ₹24,600

    2027–28 price

  • Single Phase · Oil-cooled

    Oil Type Single Phase 90-Input Transformer

    5–25 kVA · 7 ratings · 90 V input

    from

    ₹30,000

    2027–28 price

  • Three Phase · Dry type

    Three Phase Dry Type 110-Input Transformer

    7.5–30 kVA · 6 ratings · 110 V input

    from

    ₹59,000

    2027–28 price

  • Three Phase · Oil-cooled

    Three Phase Oil Type 90-Input Transformer

    7.5–400 kVA · 21 ratings · 90 V input

    from

    ₹72,000

    2027–28 price

  • Three Phase · Toroidal · Copper

    Toroidal Coil Three Phase 110-Input Transformer (Copper)

    10–100 kVA · 12 ratings · 110 V input

    from

    ₹65,000

    2027–28 price

  • Three Phase · Toroidal · Aluminium

    Toroidal Coil Three Phase 110-Input Transformer (Aluminium)

    10–100 kVA · 12 ratings · 110 V input

    from

    ₹60,000

    2027–28 price

05Questions

Asked often.

How does transformer manufacturing work at Paramount Electricals?

1. Tell us the load — The rating in kVA, the phase, and where the unit will run. 2. We quote — Against the price guide where the rating is listed, or specifically where it is not. 3. We build — Core, windings and assembly at the Srinagar factory. 4. Testing and hand-over — Collect from the outlet nearest you.

What do you need to know to quote for transformer manufacturing?

Rating in kVA, or the load in kW and the phase. Single phase or three phase supply. Dry type or oil-cooled, if you have a preference. Where the unit will be installed. With these, we can usually quote without seeing the unit.

When does it make sense to have a transformer built?

Supply runs below nominal — Our 110-input and 90-input designs are built for a supply that sags rather than one that holds steady. A replacement is no longer made — If the original unit is obsolete, we can build to the rating you need rather than the one a catalogue offers. Off-list rating — The guide lists common ratings. Manufacturing to order means the list is a starting point, not a limit.

How long will it take?

We do not promise a turnaround time before seeing the unit. Ask us when you bring it in and we will tell you honestly.

Which transformer ratings do you make?

The current price guide lists single phase transformers from 5 kVA to 25 kVA and three phase from 7.5 kVA to 400 kVA, in dry type, oil-cooled and toroidal builds. If you need a rating outside that, tell us and we will quote it.

Where are you located?

We have outlets at Maisuma Bazar in Srinagar, at Jalalabad, Sujwan in Jammu, and in Leh, plus our own factory at Sathu Payeen, Barbar Shah in Srinagar.

Tell us the rating. We’ll price it.

A kVA or HP figure and what the job is — that is enough to start.