Skip to main content

Price Guide 2027–28 now live · Prices incl. GST

Browse
Paramount Electricals

About us

The workshop at Barbar Shah.

We manufacture, rewind and repair all kinds of transformers and motors, across Jammu, Kashmir and Ladakh.

Run by
Tariq Ahmad Nayak
Outlets
3 + factory
Ratings priced
68
Largest
400 kVA

01Our story

Built on copper.

Paramount Electricals is run by Tariq Ahmad Nayak, from three outlets and our own factory. Because we build at our factory in Srinagar, we can make a transformer to the rating you actually need — and the same workshop that builds them repairs them.

Most of what comes through the door is not new. It is a motor that has stopped mid-season, a transformer that tripped in a storm, a winding that ran hot for one summer too many. Our work is to find out why, fix it properly, and tell you plainly what it will cost before we start.

The outlets in Srinagar, Jammu and Leh are there so nobody has to carry a burnt motor further than they must. Work handed in at any counter comes back to the factory, and goes home tested.

Sample content — replace before launch

years at the winding bench
25+
transformers and motors rewound
3,200+
districts served last season
11
winding machines on the factory floor
6

02Milestones

Along the way

Sample content — replace before launch

  1. 1999

    A rewinding bench in Maisuma

    One bench, one lathe and a steady queue of burnt motors from the bazaar's workshops.

  2. 2006

    The factory at Barbar Shah

    Room to build transformers from the core up, not just repair them.

  3. 2014

    An outlet in Jammu

    Winter work followed the customers south, so the workshop did too.

  4. 2019

    An outlet in Leh

    Ladakh's supply can't wait for the highway to open. Now it doesn't have to.

  5. 2027

    A published price guide

    Every transformer rating, priced in the open, GST included.

03How we work

Four things we won’t change.

  1. Look before we price

    The rating, the symptom, and an honest look at the unit come before any number.

  2. Prices in the open

    Every transformer in the guide is priced, GST included. No calling round to find out.

  3. Repair before replace

    If a rewind will do, we say so. If it will not, we say that too.

  4. One workshop, start to finish

    The people who build transformers are the people who repair them.

04The factory

Three ways we build.

Core assembly, winding and testing all happen at the factory. Anything outside the printed list, we quote to order.

  • Dry type

    Air-cooled. For indoor work where oil is unwelcome.

  • Oil-cooled

    Tank and cooling fins, for continuous load.

  • Toroidal

    A single wound ring core, copper or aluminium.

Rows of hand tools — saws, planes, chisels and screwdrivers — hung neatly on a workshop wall
A worker grinding steel in a dark workshop, a spray of orange sparks lighting his hands
A gloved hand holding the stripped copper ends of a cable in front of a work jacket
Illustrative photographs of the trade — not our premises.

05Inside

See where the work happens.

Inside the workshop

Sample content — replace before launch

I send them anything with a winding in it. What I value is the report that comes back — what failed, why, and what they changed — so I can tell my client straight.

Electrical contractorJammu · repair and rewinding

Tell us the rating. We’ll price it.

A kVA or HP figure and what the job is — that is enough to start.