7.5–400 kVA · 2027–28 prices
Three Phase Transformers
Three phase transformers supply industrial and commercial loads — motors, pumps, workshop machinery and larger buildings. The range runs from 7.5 kVA up to 400 kVA. Toroidal units use a ring-shaped core and are offered with copper or aluminium windings.
- Designs
- 4
- Ratings
- 51
- Range
- 7.5–400kVA
4 of 4 products
Clear filtersName
Three Phase Transformers: 4 products

Three Phase · Dry type
Three Phase Dry Type 110-Input Transformer
7.5–30 kVA · 6 ratings · 110 V input
from
₹59,000
2027–28 price

Three Phase · Oil-cooled
Three Phase Oil Type 90-Input Transformer
7.5–400 kVA · 21 ratings · 90 V input
from
₹72,000
2027–28 price

Three Phase · Toroidal · Aluminium
Toroidal Coil Three Phase 110-Input Transformer (Aluminium)
10–100 kVA · 12 ratings · 110 V input
from
₹60,000
2027–28 price

Three Phase · Toroidal · Copper
Toroidal Coil Three Phase 110-Input Transformer (Copper)
10–100 kVA · 12 ratings · 110 V input
from
₹65,000
2027–28 price
—From the factory
Three Phase, as built.
Units photographed at our factory in Srinagar. Tap any photograph to see it large.
On film
A 100 kVA unit, up close.
A 100 kVA three phase oil-cooled unit: digital panels in orange frames above the radiator fins
The open frame of a 100 kVA three phase unit, its toroidal coils and cores on a steel stand
A worker opening the front panel of a 100 kVA three phase unit
Three coils inside a 100 kVA unit seen past the hoist chain
The side of a 100 kVA three phase unit, its radiator fins and digital panel
—Made to order
Built at Barbar Shah, tested before it leaves.
Every three phase transformers in this guide is built at our own factory in Srinagar. If the rating you need is not listed, tell us — the guide is where a quote starts, not where it ends.


Bodies waiting for assembly
—Guides
Not sure which one?
- Transformers · 2 min readSingle-phase or three-phase: which transformer do you need?What single-phase and three-phase supply actually are, how to tell which one you have, and why the answer decides the transformer before anything else does.
- Basics · 2 min readHow to work out the kVA rating you needA plain method for turning the equipment you run into a kVA figure: add up the load, allow for power factor and motor starting, then leave sensible headroom.
- Transformers · 2 min readDry-type or oil-type: choosing how a transformer is cooledHow dry-type and oil-type transformers get rid of heat, where each one fits best, and the practical points — space, fire risk, upkeep — that usually decide it.
- Transformers · 1 min readCopper or aluminium windings: what actually changesBoth metals make good transformer windings. Here is what differs — conductivity, size, weight and cost — and what to ask when comparing the two.
Tell us the rating. We’ll price it.
A kVA or HP figure and what the job is — that is enough to start.
